Eldorado Gold Releases Updated Mineral Reserve and Mineral Resource Statement; 2022 Gold Reserves of 12.3 million ounces and M&I Gold Resources of 19.2 million ounces
The Company’s total MRMR is adjusted for the planned divestment of its non-core Romanian asset (Certej), which is consistent with the Company’s strategy of focusing on core jurisdictions in its portfolio.
Mineral Reserves Update
Net of divestitures, the Company’s Proven and Probable gold Reserves (“2P Reserves”), totalled 12.3 million ounces as of
() See “Mineral Reserve Notes” below.
Total 2P Reserves (Gold Ounces x 1,000) |
|
Proven and Probable in-situ gold ounces as of |
15,264 |
Depletion(1) | -597 |
Adjustments for metal prices, cut-off value and mine plan optimization | 46 |
Net Proven and probable in-situ gold ounces as of |
14,714 |
Certej Divestment(2) | -2,402 |
Proven and probable in-situ gold ounces as of |
12,312 |
NOTE: Numbers may not down-add due to rounding. |
|
(1) | Depletion declared here are in-situ ounces. Depletion includes Q4 2021 and Q1-Q3 2022. |
(2) | In |
Net of divestitures, and excluding depletion, the small change in Proven and Probable Reserves is attributable to conversion of Resources to Reserves in the Kokarpinar zone at Efemcukuru and infill drilling in the Upper Triangle zone at Lamaque. These gains were mostly offset by adjustments for cut-off value, metal prices and mine plan optimization at Olympias.
The following table summarizes the year-over-year changes to the Company’s gold Reserves:
Proven and Probable Reserves | ||||||
2021 | 2022 | Change(1) |
Change excluding depletion | |||
Contained |
||||||
Efemcukuru | 620 | 542 | -13 | % | 4 | % |
Kisladag | 4,282 | 4,069 | -5 | % | 0 | % |
Lamaque | 1,091 | 985 | -10 | % | 7 | % |
Olympias | 1,990 | 1,836 | -8 | % | -3 | % |
Perama Hill | 1,250 | 1,250 | - | - | ||
Skouries | 3,630 | 3,630 | - | - | ||
Certej | 2,402 | 0 | -100 | % | - | |
Total | 15,264 | 12,312 | -19 | % | -15 | % |
Less divestitures:(2) | ||||||
Certej | 2,402 | - | ||||
Gross Total | 12,862 | 12,312 | -4 | % | <1% |
NOTE: Numbers may not down-add due to rounding. |
|
(1) | The Company reports on MRMR as of |
(2) | In |
Mineral ResourcesUpdate
Eldorado’s Measured and Indicated (“M+I”) Resources totalled 19.2 million ounces, net of divestitures(1), as of
(1)The Company elected to allow the Bolcana exploration license to expire in 2021, and as such the applicable Mineral Resources have been removed from the Company’s Mineral Resources statement.
-
Efemcukuru: The decrease in Inferred Resources is attributable to the upgrade to M+I Resources at Bati and Kokarpinar, through resource conversion drilling, which demonstrates increasing geological confidence in the ore bodies, and removing isolated areas of M+I Resources that are not expected to enter the future mine plan.
-
Lamaque: The Inferred Resource increased substantially due to geological model updates. The M+I decrease is attributable to depletion, partially offset by upgrades of Inferred Resources.
-
Ormaque: The Inferred Resource increased to reflect the new Technical Study released in
February 2022 . As previously announced in theOctober 2022 exploration update, the resource conversion drilling program at Ormaque commenced inJune 2022 and will continue through 2023, targeting the upper two-thirds of the deposit. Results from this resource conversion drilling program, up to mid-2023, are expected to be reflected in the Company’s 2023 MRMR statement.
The following table summarizes the year-over-year changes to the Company’s gold Resources:
Total Measured and Indicated Resources | Inferred Resources | ||||||||
2021 | 2022 | Change(1) |
2021 | 2022 | Change(1) | ||||
Contained Au ounces (x1000) |
Contained Au ounces (x1000) |
||||||||
Efemcukuru | 1,066 | 1,069 | <1% | 629 | 431 | -31 | % | ||
Kisladag | 6,822 | 6,603 | -3 | % | 107 | 107 | 0 | % | |
Lamaque | 1,937 | 1,806 | -7 | % | 1,962 | 2,354 | 20 | % | |
Ormaque | 0 | 0 | - | 803 | 839 | 4 | % | ||
Olympias | 3,409 | 3,329 | -2 | % | 566 | 560 | -1 | % | |
Perama Hill | 1,374 | 1,374 | - | 59 | 59 | - | |||
Perama South | 0 | 0 | - | 728 | 728 | - | |||
Piavitsa | 0 | 0 | - | 1,025 | 1,025 | - | |||
Sapes | 0 | 0 | - | 820 | 820 | - | |||
Skouries | 5,030 | 5,030 | - | 814 | 814 | - | |||
Certej | 3,829 | 0 | -100 | % | 23 | 0 | -100 | % | |
Bolcana | 0 | 0 | - | 6,492 | 0 | -100 | % | ||
Total | 23,467 | 19,210 | -18 | % | 14,028 | 7,737 | -45 | % | |
Less divestitures:(2) | |||||||||
Certej | 3,829 | 23 | |||||||
Bolcana | - | 6,492 | |||||||
Gross Total | 19,683 | 19,210 | -2 | % | 7,513 | 7,737 | 3 | % |
NOTE: Numbers may not down-add due to rounding. |
|
(1) | The Company Reports on MRMR as of |
(2) | In |
About
Eldorado is a gold and base metals producer with mining, development and exploration operations in Turkiye,
Contact
Investor Relations
604.757 2237 or 1.888.353.8166
[email protected]
Media
604.757 5573 or 1.888.353.8166
[email protected]
Eldorado Gold Mineral Reserves, as of
Project | Proven Mineral Reserves | Probable Mineral Reserves | Total Proven and Probable | ||||||
Gold | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Efemcukuru | 1,567 | 5.59 | 282 | 1,617 | 5.01 | 260 | 3,184 | 5.30 | 542 |
Kisladag | 173,443 | 0.69 | 3,856 | 12,563 | 0.53 | 213 | 186,006 | 0.68 | 4,069 |
Lamaque | 877 | 6.82 | 192 | 3,753 | 6.57 | 793 | 4,630 | 6.62 | 985 |
Olympias | 1,583 | 9.31 | 474 | 6,660 | 6.36 | 1,362 | 8,243 | 6.93 | 1,836 |
Perama Hill | 3,088 | 4.03 | 400 | 9,410 | 2.81 | 850 | 12,498 | 3.11 | 1,250 |
Skouries | 73,101 | 0.87 | 2,053 | 74,015 | 0.66 | 1,576 | 147,116 | 0.77 | 3,630 |
TOTAL GOLD | 253,660 | 0.89 | 7,257 | 108,017 | 1.46 | 5,055 | 361,677 | 1.06 | 12,312 |
Silver | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Olympias | 1,583 | 136 | 6,937 | 6,660 | 132 | 28,157 | 8,243 | 132 | 35,094 |
Perama Hill | 3,088 | 4 | 403 | 9,410 | 8 | 2,277 | 12,498 | 7 | 2,680 |
TOTAL SILVER | 4,671 | 49 | 7,340 | 16,070 | 59 | 30,434 | 20,741 | 57 | 37,774 |
Copper | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Skouries | 73,101 | 0.52 | 381 | 74,015 | 0.48 | 359 | 147,116 | 0.50 | 740 |
TOTAL COPPER | 73,101 | 0.52 | 381 | 74,015 | 0.48 | 359 | 147,116 | 0.50 | 740 |
Lead | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 1,583 | 4.4 | 70 | 6,660 | 4.5 | 300 | 8,243 | 4.5 | 369 |
TOTAL LEAD | 1,583 | 4.4 | 70 | 6,660 | 4.5 | 300 | 8,243 | 4.5 | 369 |
Zinc | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 1,583 | 5.0 | 79 | 6,660 | 5.4 | 360 | 8,243 | 5.3 | 439 |
TOTAL ZINC | 1,583 | 5.0 | 79 | 6,660 | 5.4 | 360 | 8,243 | 5.3 | 439 |
Eldorado Gold Mineral Reserves, as of
Project | Proven Mineral Reserves | Probable Mineral Reserves | Total Proven and Probable | ||||||
Gold | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Certej | 22,788 | 1.93 | 1,414 | 21,500 | 1.43 | 988 | 44,288 | 1.69 | 2,402 |
Efemcukuru | 1,732 | 6.03 | 336 | 1,645 | 5.37 | 284 | 3,377 | 5.71 | 620 |
Kisladag | 183,092 | 0.69 | 4,061 | 12,819 | 0.54 | 221 | 195,911 | 0.68 | 4,282 |
Lamaque | 502 | 8.02 | 129 | 4,154 | 7.20 | 962 | 4,656 | 7.29 | 1,091 |
Olympias | 1,205 | 10.87 | 421 | 8,132 | 6.00 | 1,569 | 9,337 | 6.63 | 1,990 |
Perama Hill | 3,088 | 4.03 | 400 | 9,410 | 2.81 | 850 | 12,498 | 3.11 | 1,250 |
Skouries | 73,101 | 0.87 | 2,053 | 74,015 | 0.66 | 1,576 | 147,116 | 0.77 | 3,630 |
TOTAL GOLD | 285,508 | 0.96 | 8,814 | 131,674 | 1.52 | 6,450 | 417,182 | 1.14 | 15,264 |
Silver | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Certej | 22,788 | 10 | 7,004 | 21,500 | 12 | 8,551 | 44,288 | 11 | 15,555 |
Olympias | 1,205 | 155 | 6,006 | 8,132 | 116 | 30,422 | 9,337 | 121 | 36,428 |
Perama Hill | 3,088 | 4 | 403 | 9,410 | 8 | 2,277 | 12,498 | 7 | 2,680 |
0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
TOTAL SILVER | 27,081 | 15 | 13,413 | 39,042 | 33 | 41,250 | 66,123 | 26 | 54,663 |
Copper | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Skouries | 73,101 | 0.52 | 381 | 74,015 | 0.48 | 359 | 147,116 | 0.50 | 740 |
TOTAL COPPER | 73,101 | 0.52 | 381 | 74,015 | 0.48 | 359 | 147,116 | 0.50 | 740 |
Lead | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 1,205 | 4.9 | 59 | 8,132 | 4.0 | 323 | 9,337 | 4.1 | 382 |
0 | 0.0 | 0 | 0 | 0.0 | 0 | 0 | 0.0 | 0 | |
TOTAL LEAD | 1,205 | 4.9 | 59 | 8,132 | 4.0 | 323 | 9,337 | 4.1 | 382 |
Zinc | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 1,205 | 5.6 | 68 | 8,132 | 5.0 | 410 | 9,337 | 5.1 | 477 |
0 | 0.0 | 0 | 0 | 0.0 | 0 | 0 | 0.0 | 0 | |
TOTAL ZINC | 1,205 | 5.6 | 68 | 8,132 | 5.0 | 410 | 9,337 | 5.1 | 477 |
Eldorado Gold Mineral Resources, as of
Project | Measured Resources | Indicated Resources | Total Measured and Indicated | Inferred Resources | ||||||||
Gold | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Efemcukuru | 1,857 | 7.37 | 440 | 2,842 | 6.88 | 629 | 4,699 | 7.07 | 1,069 | 2,677 | 5.01 | 431 |
Kisladag | 300,070 | 0.61 | 5,895 | 44,408 | 0.50 | 708 | 344,478 | 0.60 | 6,603 | 7,529 | 0.44 | 107 |
Lamaque | 1,125 | 9.14 | 331 | 5,978 | 7.68 | 1,475 | 7,103 | 7.91 | 1,806 | 10,003 | 7.32 | 2,354 |
Ormaque | 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2,223 | 11.74 | 839 |
Olympias | 2,618 | 10.49 | 883 | 10,319 | 7.37 | 2,446 | 12,937 | 8.00 | 3,329 | 2,186 | 7.97 | 560 |
Perama Hill | 3,093 | 4.15 | 412 | 10,973 | 2.73 | 962 | 14,066 | 3.04 | 1,374 | 1,136 | 1.63 | 59 |
Perama South | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 14,870 | 1.52 | 728 |
Piavitsa | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 6,613 | 4.82 | 1,025 |
Sapes | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 3,434 | 7.43 | 820 |
Skouries | 90,714 | 0.85 | 2,479 | 149,260 | 0.53 | 2,551 | 239,974 | 0.65 | 5,030 | 67,657 | 0.37 | 814 |
TOTAL GOLD | 399,477 | 0.81 | 10,439 | 223,779 | 1.22 | 8,771 | 623,256 | 0.96 | 19,210 | 118,328 | 2.03 | 7,738 |
Silver | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Olympias | 2,618 | 148 | 12,440 | 10,319 | 148 | 49,212 | 12,937 | 148 | 61,651 | 2,186 | 190 | 13,368 |
Perama Hill | 3,093 | 4 | 415 | 10,973 | 7 | 2,579 | 14,066 | 7 | 2,994 | 1,136 | 2 | 83 |
Piavitsa | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 6,613 | 54 | 11,389 |
0 | 0 | 0 | 1,351 | 153 | 6,647 | 1,351 | 153 | 6,647 | 1,700 | 162 | 8,866 | |
TOTAL SILVER | 5,711 | 70 | 12,855 | 22,643 | 80 | 58,438 | 28,354 | 78 | 71,292 | 11,635 | 90 | 33,706 |
Copper | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Skouries | 90,714 | 0.51 | 466 | 149,260 | 0.44 | 652 | 239,974 | 0.47 | 1,118 | 67,657 | 0.40 | 267 |
TOTAL COPPER | 90,714 | 0.51 | 466 | 149,260 | 0.44 | 652 | 239,974 | 0.47 | 1,118 | 67,657 | 0.40 | 267 |
Lead | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 2,618 | 4.8 | 125 | 10,319 | 5.0 | 520 | 12,937 | 5.0 | 645 | 2,186 | 6.5 | 142 |
0 | 0.0 | 0 | 1,351 | 6.1 | 82 | 1,351 | 6.1 | 82 | 1,700 | 6.2 | 106 | |
TOTAL LEAD | 2,618 | 4.80 | 125 | 11,670 | 5.2 | 602 | 14,288 | 5.1 | 727 | 3,886 | 6.4 | 248 |
Zinc | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 2,618 | 5.7 | 150 | 10,319 | 6.6 | 682 | 12,937 | 6.4 | 831 | 2,186 | 7.3 | 158 |
0 | 0.0 | 0 | 1,351 | 8.7 | 117 | 1,351 | 8.7 | 117 | 1,700 | 9.3 | 158 | |
TOTAL ZINC | 2,618 | 5.7 | 150 | 11,670 | 6.8 | 799 | 14,288 | 6.6 | 948 | 3,886 | 8.1 | 316 |
Eldorado Gold Mineral Resources, as of
Project | Measured Resources | Indicated Resources | Total Measured and Indicated | Inferred Resources | ||||||||
Gold | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au | Tonnes | Au | Contained Au |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Bolcana | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 381,000 | 0.53 | 6,492 |
Certej | 29,300 | 1.73 | 1,626 | 58,653 | 1.17 | 2,203 | 87,953 | 1.35 | 3,829 | 842 | 0.86 | 23 |
Efemcukuru | 2,437 | 7.38 | 578 | 2,178 | 6.96 | 488 | 4,615 | 7.18 | 1,066 | 3,300 | 5.93 | 629 |
Kisladag | 311,255 | 0.61 | 6,111 | 44,581 | 0.50 | 712 | 355,836 | 0.60 | 6,822 | 7,529 | 0.44 | 107 |
Lamaque | 876 | 9.49 | 267 | 6,246 | 8.32 | 1,670 | 7,122 | 8.46 | 1,937 | 8,880 | 6.87 | 1,962 |
Ormaque | 0 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 2,620 | 9.53 | 803 |
Olympias | 2,343 | 10.66 | 803 | 10,905 | 7.43 | 2,606 | 13,248 | 8.00 | 3,409 | 2,092 | 8.41 | 566 |
Perama Hill | 3,093 | 4.15 | 412 | 10,973 | 2.73 | 962 | 14,066 | 3.04 | 1,374 | 1,136 | 1.63 | 59 |
Perama South | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 14,870 | 1.52 | 728 |
Piavitsa | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 6,613 | 4.82 | 1,025 |
Sapes | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 3,434 | 7.43 | 820 |
Skouries | 90,714 | 0.85 | 2,479 | 149,260 | 0.53 | 2,551 | 239,974 | 0.65 | 5,030 | 67,657 | 0.37 | 814 |
TOTAL GOLD | 440,017 | 0.87 | 12,276 | 282,796 | 1.23 | 11,191 | 722,814 | 1.01 | 23,467 | 499,973 | 0.87 | 14,028 |
Silver | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag | Tonnes | Ag | Contained Ag |
(x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | (x1000) | g/t | ounces (x1000) | |
Certej | 29,300 | 9 | 8,111 | 58,653 | 10 | 18,103 | 87,953 | 9 | 26,214 | 842 | 4 | 110 |
Olympias | 2,343 | 149 | 11,203 | 10,905 | 142 | 49,841 | 13,248 | 143 | 61,043 | 2,092 | 179 | 12,070 |
Perama Hill | 3,093 | 4 | 415 | 10,973 | 7 | 2,579 | 14,066 | 7 | 2,994 | 1,136 | 2 | 83 |
Piavitsa | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 6,613 | 54 | 11,389 |
0 | 0 | 0 | 1,351 | 153 | 6,647 | 1,351 | 153 | 6,647 | 1,700 | 162 | 8,866 | |
TOTAL SILVER | 34,736 | 18 | 19,729 | 81,882 | 29 | 77,170 | 116,618 | 26 | 96,898 | 12,383 | 82 | 32,518 |
Copper | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu | Tonnes | Cu | Contained Cu |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Bolcana | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | 381,000 | 0.18 | 686 |
Skouries | 90,714 | 0.51 | 466 | 149,260 | 0.44 | 652 | 239,974 | 0.47 | 1,118 | 67,657 | 0.40 | 267 |
TOTAL COPPER | 90,714 | 0.51 | 466 | 149,260 | 0.44 | 652 | 239,974 | 0.47 | 1,118 | 448,657 | 0.21 | 953 |
Lead | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb | Tonnes | Pb | Contained Pb |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 2,343 | 4.8 | 113 | 10,905 | 4.8 | 527 | 13,248 | 4.8 | 640 | 2,092 | 5.9 | 124 |
0 | 0.0 | 0 | 1,351 | 6.1 | 82 | 1,351 | 6.1 | 82 | 1,700 | 6.2 | 106 | |
TOTAL LEAD | 2,343 | 4.81 | 113 | 12,256 | 5.0 | 609 | 14,599 | 4.9 | 722 | 3,792 | 6.1 | 230 |
Zinc | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn | Tonnes | Zn | Contained Zn |
(x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | (x1000) | % | tonnes (x1000) | |
Olympias | 2,343 | 5.7 | 134 | 10,905 | 6.4 | 701 | 13,248 | 6.3 | 835 | 2,092 | 7.1 | 149 |
0 | 0.0 | 0 | 1,351 | 8.7 | 117 | 1,351 | 8.7 | 117 | 1,700 | 9.3 | 158 | |
TOTAL ZINC | 2,343 | 5.7 | 134 | 12,256 | 6.7 | 818 | 14,599 | 6.5 | 952 | 3,792 | 8.1 | 307 |
Notes on Mineral Resources and Reserves
-
Mineral Resources and Mineral Reserves are as of
September 30, 2022 -
The Mineral Resources and Mineral Reserves were classified using logic consistent with the CIM Definition Standards for Mineral Resources & Mineral Reserves (2014) incorporated, by reference, into National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). -
Mineral Reserves are included in the Mineral Resources.
-
The Mineral Resources and Mineral Reserves are disclosed on a total project basis.
Mineral resources which are not mineral reserves do not have demonstrated economic viability. With respect to “inferred mineral resources”, there is a great amount of uncertainty as to their existence and a great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an “indicated mineral resource” or “inferred mineral resource” will ever be upgraded to a higher category.
Cautionary Note to US Investors Concerning Estimates of Measured, Indicated and Inferred Resources
There are differences between the standards and terms used for reporting mineral reserves and resources in
These standards differ from the requirements of the
Mineral Reserve Notes
Eldorado reports Mineral Reserves in accordance with CIM Definition Standards. All Mineral Reserves are determined using a long-term gold price (
1. Long-Term Metal Price Assumptions
-
Gold price:
$1,300 /oz -
Silver price:
$17.00 /oz -
Copper price:
$2.75 /lb -
Lead price:
$2,000 /t -
Zinc price:
$2,400 /t
2. Cut-off Grades
Certej: 0.90 g/t Au Equivalent grade (=Au(g/t)+Ag(g/t)*0.0121); Efemcukuru:
3. Qualified Persons
The following persons, all of whom are qualified persons under NI 43-101, have approved the disclosure contained within this release:
Asset | Mining Type(s) | Qualified Person | Company |
Efemcukuru | Underground |
, |
|
Kisladag |
|
, |
|
Lamaque | Underground |
, géo (OGQ No. 758)., Technical Services Director Lamaque |
|
Olympias | Underground |
, |
|
Skouries |
|
, |
|
Skouries | Underground |
, |
|
Perama Hill |
|
, |
|
Certej |
|
, |
|
Mineral Resource Notes
Eldorado reports Mineral Resources in accordance with CIM Definition Standards. All Mineral Resources are assessed for reasonable prospects for eventual economic extraction (RPEEE). The Resource cut-off grades or values (e.g. gold equivalent) are determined using a long-term gold price (
1. Long-Term Metal Price Assumptions:
-
Gold price:
$1,800 /oz -
Silver price:
$24 /oz -
Copper price:
$3.25 /lb -
Lead price:
$2,200 /t -
Zinc price:
$2,600 /t
2. Mineral Resource Reporting and demonstration of Reasonable Prospects for Eventual Economic Extraction:
3. Cut-off Grades
Bolcana: 0.30 g/t Au Equivalent grade (open pit), 0.65 g/t Au Equivalent grade (underground) (=Au g/t + 1.27*Cu%); Certej: 0.60 g/t Au; Efemcukuru: 2.5 g/t Au; Kisladag: 0.25 g/t Au; Lamaque: 3.0 g/t Au; Ormaque: 3.5 g/t Au; Olympias:
4. Qualified Persons
The following persons, all of whom are qualified persons under NI 43-101, have approved the disclosure contained within this release:
Asset | Mining Type(s) | Qualified Person | Company |
Efemcukuru | Underground |
, |
|
Kisladag |
|
, |
|
Lamaque | Underground |
, géo (OGQ No. 758)., Technical Services Director Lamaque |
|
Ormaque | Underground |
, géo (OGQ No. 758)., Technical Services Director Lamaque |
|
Olympias | Underground |
, |
|
Skouries |
|
, |
|
Skouries | Underground |
, |
|
Perama Hill |
|
, |
|
Perama South |
|
, |
|
Piavitsa | Underground |
, |
|
Sapes | Underground and |
, |
|
|
Underground |
, |
|
Certej |
|
, |
|
Note Regarding Mineral Reserve and Mineral Resources:
All Mineral Reserves and Mineral Resources have been estimated in accordance with the standards of the
-
Technical report entitled "Technical Report,
Kisladag Gold Mine , Turkiye” with an effective date ofJanuary 17, 2020 . -
Technical report entitled "Technical Report,
Efemcukuru Gold Mine , Turkiye” with an effective date ofDecember 31, 2019 . -
Technical report entitled “Technical Report,
Olympias Mine , Greece” with an effective date ofDecember 31, 2019 . -
Technical report entitled “Technical Report,
Skouries Project , Greece” with an effective date ofJanuary 22, 2022 . -
Technical report entitled “Technical Report, for the
Lamaque Project ,Quebec , Canada’” with an effective date ofDecember 31, 2021 .
Cautionary Note about Forward-looking Statements and Information
Certain of the statements made and information provided in this press release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as “anticipates”, “believes”, “budget”, “continue”, “estimates”, “expects”, “forecasts”, “foresee”, “future”, “goal”, “guidance”, “intends”, “opportunity”, “outlook”, “plans”, “potential”, “strive”, “target” or “underway” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “can”, “could”, “likely”, “may”, “might”, “will” or “would” be taken, occur or be achieved.
Forward-looking statements or information contained in this release include, but are not limited to, statements or information with respect to: our mineral reserves and mineral resources; the sale of the Certej project; our expectation as to our future financial and operating performance, including future cash flow, estimated cash costs, expected metallurgical recoveries and gold price outlook; and our strategy, plans and goals, including our proposed exploration, development, construction, permitting and operating plans and priorities, related timelines and schedules. Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.
We have made certain assumptions about the forward-looking statements and information, including assumptions about: ability to obtain all required approvals and permits; changes in input costs, exchange rates, development and gold; the geopolitical, economic, permitting and legal climate that we operate in; our preliminary gold production and our guidance, benefits of the completion of the decline at Lamaque, the improvements at Kisladag and the optimization of Greek operations; tax expenses in Turkiye; how the world-wide economic and social impact of COVID-19 is managed and the duration and extent of the COVID-19 pandemic; timing, cost and results of our construction and exploration; the geopolitical, economic, permitting and legal climate that we operate in; the future price of gold and other commodities; the global concentrate market; exchange rates; anticipated values, costs, expenses and working capital requirements; production and metallurgical recoveries; mineral reserves and resources; and the impact of acquisitions, dispositions, suspensions or delays on our business and the ability to achieve our goals. In addition, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis as exists at the time of this release.
Even though our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statement or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others, the following: inability to meet production guidance; inability to achieve the expected benefits of the completion of the decline at Lamaque, the improvements at Kisladag and the optimization of Greek operations; inability to assess income tax expenses in Turkiye; risks relating to the ongoing COVID-19 pandemic and any future pandemic, epidemic, endemic or similar public health threats; risks relating to our operations being located in foreign jurisdictions; community relations and social license; climate change; liquidity and financing risks; development risks; indebtedness, including current and future operating restrictions, implications of a change of control, ability to meet debt service obligations, the implications of defaulting on obligations and change in credit ratings; environmental matters; waste disposal; the global economic environment; government regulation; reliance on a limited number of smelters and off-takers; commodity price risk; mineral tenure; permits; risks relating to environmental sustainability and governance practices and performance; non-governmental organizations; corruption, bribery and sanctions; litigation and contracts; information technology systems; estimation of mineral reserves and mineral resources; production and processing estimates; credit risk; actions of activist shareholders; price volatility, volume fluctuations and dilution risk in respect of our shares; reliance on infrastructure, commodities and consumables; currency risk; inflation risk; interest rate risk; tax matters; dividends; financial reporting, including relating to the carrying value of our assets and changes in reporting standards; labour, including relating to employee/union relations, employee misconduct, key personnel, skilled workforce, expatriates and contractors; reclamation and long-term obligations; regulated substances; necessary equipment; co-ownership of our properties; acquisitions, including integration risks, and dispositions; the unavailability of insurance; conflicts of interest; compliance with privacy legislation; reputational issues; competition, as well as those risk factors discussed in the sections titled “Forward-looking information and risks” and “Risk factors in our business” in our most recent Annual Information Form & Form 40-F. The reader is directed to carefully review the detailed risk discussion in our most recent Annual Information Form & Form 40-F filed on SEDAR and EDGAR under our Company name, which discussion is incorporated by reference in this release, for a fuller understanding of the risks and uncertainties that affect our business and operations.
The inclusion of forward-looking statements and information is designed to help you understand management’s current views of our near- and longer-term prospects, and it may not be appropriate for other purposes.
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company’s business contained in the Company’s reports filed with the securities regulatory authorities in
Qualified Person
Except as otherwise noted,
Source: