Eldorado Gold Announces Third Quarter 2021 Preliminary Production Results and Conference Call Details
Q3 2021 and Year-to-Date 2021 Preliminary Gold Production
| Production (oz) | |||
| Mine | Q3 2021 | Q3 2020 | Q2 2021 |
| Kısladag | 51,040 | 59,593 | 44,016 |
| Lamaque | 37,369 | 39,525 | 35,643 |
| Efemcukuru | 23,305 | 23,892 | 23,473 |
| Olympias | 13,745 | 13,912 | 12,934 |
| Total Gold Production (oz) | 125,459 | 136,922 | 116,066 |
| Production (oz) | |||
| Mine | YTD 2021 | YTD 2020 | |
| Kısladag | 141,229 | 169,659 | |
| Lamaque | 101,847 | 99,973 | |
| Efemcukuru | 70,076 | 74,007 | |
| Olympias | 40,116 | 47,015 | |
| Total Gold Production (oz) | 353,268 | 390,654 | |
Third quarter gold production at Lamaque remained on track with both throughput and grade in-line with 2021 plans. The decline connecting the Sigma mill with the Triangle underground mine is progressing on schedule and is expected to be completed in the fourth quarter. Infill and expansion drilling at Ormaque continued during the third quarter. Refer to the
Kisladag performed well in the third quarter with gold production higher than previously forecast. Several operational improvements implemented in the mine, crushing circuit, and leach pad earlier this year are resulting in increased throughput. The commissioning of the high-pressure grinding roll (HPGR) circuit remains on track.
At Efemcukuru, gold production, throughput, and average gold grade were in-line with expectations.
The Company’s profits from mining operations in
Third quarter production at Olympias reflects some initiatives that were implemented in relation to the transformation efforts at the Kassandra assets in
Q3 2021 Financial and Operational Results Call Details
Eldorado will release its third quarter 2021 Financial and Operational Results after the market closes on
| Conference Call Details |
Replay (available until |
||
| Date: |
|
: |
+1 604 638 9010 |
| Time: | ( |
Toll Free: | 1 800 319 6413 |
| Dial in: | +1 604 638 5340 | Access code: | 7602 |
| Toll free: | 1 800 319 4610 | ||
About
Eldorado is a gold and base metals producer with mining, development and exploration operations in
Contact
Investor Relations
604.757 2237 or 1.888.353.8166
[email protected]
Media
604.757 5573 or 1.888.363.8166
[email protected]
Cautionary Note about Forward-looking Statements and Information
Certain of the statements made and information provided in this press release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as "plans", "expects", "is expected", "budget", “continue”, “projected”, "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
Forward-looking statements or information contained in this release include, but are not limited to, statements or information with respect to: our preliminary third quarter 2021 gold production, the Company’s 2021 annual guidance, including at our individual mine production; construction of the decline connecting Sigma mill with the Triangle underground mine, including the timing of completion; continued drilling at the Ormaque gold resource, completion of the HPGR circuit, including the timing of completion; expected tax expense in
We have made certain assumptions about the forward-looking statements and information, including assumptions about: our preliminary gold production and our guidance, timing of construction of the decline between Sigma mill and the Triangle underground mine; results from drilling at Ormaque; benefits of the improvements at Kisladag; how the world-wide economic and social impact of COVID-19 is managed and the duration and extent of the COVID-19 pandemic; timing and cost of construction and exploration; the geopolitical, economic, permitting and legal climate that we operate in; the future price of gold and other commodities; the global concentrate market; exchange rates; anticipated costs, expenses and working capital requirements; production, mineral reserves and resources and metallurgical recoveries; the impact of acquisitions, dispositions, suspensions or delays on our business; and the ability to achieve our goals. In particular, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis as exists at the time of this release.
Even though our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statement or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others: inability to meet production guidance, inability to complete construction of the decline between Triangle mill and the Triangle underground mine on time or to meet expected timing thereof, poor results from drilling at Ormaque; inability to complete improvements at Kisladag or to meeting expected timing thereof, or to achieve the benefits thereof; inability to assess taxes in
The inclusion of forward-looking statements and information is designed to help you understand management’s current views of our near- and longer-term prospects, and it may not be appropriate for other purposes.
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change.
Except as otherwise noted, scientific and technical information contained in this press release was reviewed and approved by

Source: