Eldorado Gold Announces New Lamaque Technical Study Highlighting Significant Increased Economic Upside
Key Highlights
- Base case economics using a gold price assumption of
$1,500 per ounce:- Upper Triangle Reserves NPV5%1 of
$459 million - Lower Triangle Inferred Resource NPV5% of
$162 million and IRR2,3 of 33% - Ormaque Inferred Resources NPV5% of
$197 million and IRR 39%2,4
- Upper Triangle Reserves NPV5%1 of
- Upside economics using spot gold price assumption of
$1,900 per ounce:- Upper Triangle Reserves NPV5% of
$673 million - Lower Triangle Inferred Resource NPV5% of
$295 million and IRR of 48% - Ormaque Inferred Resources NPV5% of
$285 million and IRR 45%
- Upper Triangle Reserves NPV5% of
- Key growth opportunities: High-grade inferred resources (Lower Triangle zones and Ormaque deposit) provide potential for significant production increases and opportunities for resource expansion. Based on successful conversion of inferred resources at Lower Triangle and Ormaque, mining would commence in these areas in 2026. With multiple concurrent centers of production, this represents a de-risked approach to extending the production profile at Lamaque.
- Increased gold production to over 190,000 ounces per year based on the Upper Triangle reserves; and sustaining over 180,000 ounces per year with production from Lower Triangle Inferred and Ormaque inferred resources.
- Extended mine life with ~5.5 years of production from Upper Triangle reserves, and potential for an additional ~8.5 years of mine life from Lower Triangle and Ormaque inferred resources.
- Well-positioned in the prolific
Abitibi Greenstone Belt : In 2021, Eldorado expanded its land position by over 500% with the acquisition of QMX Gold (referred to as the Bourlamaque property), which is in close proximity to theLamaque Project . - Readily equipped: Robust surface infrastructure is already in place at the Triangle mine. To support current operations and continue mining the Upper Triangle Reserves, additional infrastructure is required on the Sigma tailings, and the mine dewatering systems.
- Permitting advancing and in compliance:
The Lamaque Project is fully permitted under Federal and Provincial regulations. The project is in compliance regarding environmental quality and is regularly assessed by Provincial authorities in accordance with the Environmental Quality Act (“EQA”) ofQuebec . Discussions with Provincial Ministries about making changes to the existing permits have commenced with Provincial Ministries and are expected to be a normal course. - Strong collaboration and support from the Val-d’Or communities and a transparent and predictable regulatory environment makes
Quebec a world-class mining jurisdiction.
1 After-tax net present value at a discount rate of 5%. 2 After-tax internal rate of return. 3 NPV and IRR for Lower Triangle is calculated on the differential after-tax cash flow between the Lower Triangle + Upper Triangle (B) and the standalone Upper Triangle case (A). 4 NPV and IRR for Ormaque is calculated on the differential after-tax cash flow between the Ormaque + Lower Triangle + Upper Triangle (C) and (B).
“The Lamaque Project has been an outstanding acquisition for Eldorado Gold,” said
“With the Triangle-Sigma decline project now complete, we are focused on an exploration drift and resource conversion at Ormaque,” adds Burns. “Our 2022 exploration strategy is also focused on resource expansion at Ormaque and in the Upper and Lower Triangle zones and testing new targets within our expanded license area to support continued growth at Lamaque. Furthermore, our strategic positioning in the Abitibi region gives us additional exposure to the potential upside in the resource-rich area. We have a safe, successful track record of project execution and project delivery, which is a testament to our team. We are fortunate to have a dedicated and experienced workforce whose commitment to project delivery has been unwavering. Our strategic position in the region and our strong, collaborative local relationships will allow us to continue to drive sustainable, long-term benefits for the community in Val-d’Or, and continue to deliver value for our shareholders.”
Technical Study Highlights1
As outlined in the table below, results from the Technical Study present the mining of three separate zones:
- Feasibility-level update to the current operation centered on the Mineral Reserves in the Upper Triangle zones and Parallel deposit;
- Preliminary economic assessment (“PEA”) of Inferred Resources from the Lower Triangle zones; and
- PEA of Inferred Resources from the Ormaque deposit.
2022 Technical Study | |||
Reserves Case | Preliminary Economic Assessments1 | ||
Upper Triangle | Lower Triangle Inferred Resources Case | Ormaque Inferred Resources Case | |
Production | |||
Life of Mine (LOM) | ~5.5 years remaining LOM |
~4.5 years potential LOM extension | ~3.5 years potential LOM extension |
Average Annual Gold Production over LOM (oz) | 187,000 | 180,000 | 181,000 |
Average Annual |
825 | 846 | 872 |
Incremental | Incremental | ||
Average Gold Grade (g/t) | 7.3 | 6.4 | 6.9 |
Recovery (%) | 96.5 | 95.0 | 96.5 |
Operating Costs3 | Incremental | Incremental | |
Annual Average Cost ($M) | 111.9 | 113.3 | 122.6 |
Average cost ($/tonne ore) | 136 | 129 | 143 |
Average cost ($/oz Au) | 597 | 656 | 670 |
Capital Costs | Incremental | Incremental | |
Growth Capital ($M) | 70 | 86 | 20 |
Sustaining Capital ($M) | 230 | 239 | 88 |
Total Capital ($M) | 300 | 325 | 108 |
Economic Analysis | Incremental | Incremental | |
NPV @ 5% discount rate ($M) | 459 | 162 | 197 |
IRR (%) | n.a.2 | 33 | 39 |
Gold price assumption ($/oz) | 1,500 | 1,500 | 1,500 |
1 The Inferred Resources Cases are PEAs. As the PEAs supporting the Ormaque Inferred Resources and the Lower Triangle Inferred Resources consider the potential economic viability of developing the separate satellite deposit that comprises the Ormaque Inferred Resources and the separate zones that comprise the Lower Triangle Inferred Resources in conjunction with the main zones of the Upper Triangle Reserves development project, these PEAs will not impact the results of the economic/financial assessment of the Upper Triangle Reserves.
2 The project’s cashflow remains positive in each year, as such there is no calculated internal rate of return or payback period. Capital expenditures are part of ongoing operational development and are funded by ongoing gold sales and there are no external funding requirements.
3 These measures are non-IFRS measures. See the section ‘Non-IFRS Measures’ at the end of this press release and in Eldorado’s
The PEAs of Inferred Resources from the Lower Triangle zones and the Ormaque deposit are distinct from and do not affect the feasibility-level update to the current operations on the Mineral Reserves in the Upper Triangle zones and Parallel deposit.
Review of Operations
Eldorado owns the
1 Cash operating costs per ounce is a non-IFRS measure. Certain additional disclosures for non-IFRS measures have been incorporated by reference and additional detail can be found at the end of this press release and in the section ‘Non-IFRS Measures’ of Eldorado’s
Property Description
Since the acquisition of
Figure 1: Location of the
Figure 2: Long-section of the
Review of Economic Analysis1
The Upper Triangle Reserves NPV5% of
Separately, the PEA for the Lower Triangle Inferred Resource, based on
Separately, the PEA for the Ormaque Inferred Resource, based on
The economic models were subjected to sensitivity analyses to determine the effects of changing metal prices, capital, and operating expenditures on financial returns. This analysis showed that the project economics are robust and are most sensitive to metal prices.
Reserve Case and Inferred Resource Cases After-Tax NPV(5%) and IRR Sensitivity
Sensitivity Table – Gold Price | |||||
Reserves Case | Inferred Resources Case | ||||
Upper Triangle | Lower Triangle | Ormaque | |||
Gold Price ($/oz) |
After-Tax NPV ($M) | After Tax NPV ($M) | IRR (%) |
After Tax NPV ($M) | IRR (%) |
318 | 81 | 21 | 137 | 31 | |
459 | 162 | 33 | 197 | 39 | |
673 | 295 | 48 | 285 | 45 | |
722 | 328 | 51 | 307 | 47 |
The PEAs supporting the Lower Triangle Inferred Resource and the Ormaque Inferred Resource, consider the potential economic viability of developing the separate zones that comprise the Lower Triangle Inferred Resource and the separate satellite deposit that comprises the Ormaque Inferred Resource in conjunction with the main zones of the Upper Triangle Reserves development project.
1 See “Notes on Lower Triangle Inferred and Ormaque Inferred PEAs” below.
Capital Costs
As outlined in the table below, the initial growth capital required for both the reserves and inferred cases is modest.
Preliminary Economic Assessments | |||
Reserves Case | Inferred Resources Case | ||
Upper Triangle | Lower Triangle | Ormaque | |
Growth Capital ($M) | 70 | 86 | 20 |
Sustaining Capital ($M) | 226 | 243 | 88 |
Total Capital ($M) | 296 | 329 | 108 |
Operating Costs1
The table below provides the operating costs for the Upper Triangle Reserves Case and the Lower Triangle Inferred Case and the Ormaque Inferred Case. The operating costs estimate for the Upper Triangle Reserves Case average
Preliminary Economic Assessments | |||
Reserves Case | Inferred Resources Case | ||
Upper Triangle | Lower Triangle | Ormaque | |
Annual Average Cost ($M) | 112 | 113 | 123 |
Average cost ($/tonne ore) | 136 | 129 | 143 |
Average cost ($/oz Au) | 597 | 656 | 670 |
All-in Sustaining Cost | 829 | 979 | 819 |
1 These measures are non-IFRS measures. See the section ‘Non-IFRS Measures’ at the end of this press release and in Eldorado’s
Optimization and Future Opportunity
As part of an overall growth strategy in the Abitibi area, Eldorado continues to evaluate exploration and development opportunities for high-grade ore that could be mined and trucked to the Sigma mill as well as bulk mining opportunities that would entail upgrading the Sigma mill to its permitted capacity of 5,000 tonnes per day.
Another area for opportunity highlighted in the Technical Study was the use of alternate materials handling technologies for the Lower Triangle zones. Materials handling trade-off studies at a PEA level indicate a potential for reducing costs, reducing equipment and ventilation requirements, while at the same time reducing greenhouse gas emissions. Further studies will be carried out to increase the level of confidence in the costs and benefits of technologies evaluated, which include vertical conveyors, conventional conveying, or the use of battery electric vehicle trucks.
Geology and Mineralization
There are three deposits: i) Triangle, consisting of zones C1 through C5 in Upper Triangle, and C6 through C10 in Lower Triangle, ii) Parallel and iii) Ormaque. Gold mineralization in the Triangle, Parallel and Ormaque deposits occurs primarily within quartz-tourmaline-carbonate-pyrite shear and extension veins. At Triangle, most of the deposit is contained within a series of shear veins (C1-C10) emplaced along steeply south-dipping reverse shear zones. The ore zones are localized where the shear zones cut across the subvertical Triangle Plug, but extend into the adjacent mafic lapilli-blocks tuffs as well.
The Parallel and Ormaque deposits are located two kilometers northwest of the Triangle mine portal, adjacent to the Triangle-Sigma decline. Mineralized veins in both are hosted within fine- to medium-grained C-porphyry diorite. Ormaque is dominated by gently south-dipping extension veins and minor breccia zones, localized adjacent to sub-vertical shear zones. At Parallel, mineralized zones consist of gently-dipping extension veins in the upper part of the deposit and more steeply-dipping shear-hosted veins at deeper levels.
Infrastructure
Through its existing infrastructure, the
The site has its own water management and collection ponds. The existing power line connecting the
Environment and Permitting
The Triangle mine at the
There is an existing CoA for mining in the Ormaque deposit, but this will require an amendment to allow for mining below a depth of 453 meters. There are no indications that the project will be unsuccessful in obtaining a permit amendment.
Reclamation costs for the
Mineral Resources Estimate
The table below provides the Mineral Resource Estimate for the
Mineral Resources, as of
Deposit/Zone | Categories | Tonnes (x 1,000) |
(g/t) |
Contained Au (oz x 1,000) |
Upper Triangle | Measured | 876 | 9.49 | 267 |
Indicated | 5,316 | 8.51 | 1,453 | |
Measured + Indicated | 6,191 | 8.65 | 1,721 | |
Inferred | 1,792 | 6.63 | 382 | |
Lower Triangle | Inferred | 6,408 | 6.89 | 1,420 |
Parallel | Indicated | 221 | 9.87 | 70.2 |
Inferred | 200 | 8.83 | 56.7 | |
Ormaque2 | Inferred | 2,223 | 11.74 | 839 |
1 See “Notes on Mineral Resources” below.
2 Ormaque Inferred Resources as of
Notes on Mineral Resources
Mineral Resources and Mineral Reserves are as of
- Mineral Resource Reporting and demonstration of Reasonable Prospects for Eventual Economic Extraction:
The Mineral Resources used a long term look gold metal price of$1,800 /oz for the determination of resource cut-off grades or values. This guided execution of the next step where constraining surfaces or volumes were created to control resource reporting. Underground Resources were constrained by 3D volumes whose design was guided by the reporting cut-off grade or value, contiguous areas of mineralization and mineability. Only material internal to these volumes were eligible for reporting. - Cut-off Grades Lamaque: 3.0 g/t Au; Ormaque: 3.5 g/t Au
Triangle Deposit
The Mineral Resource estimates for the Upper Triangle zones and the Lower Triangle zones of the Triangle deposit used data from both surface and underground diamond drillholes. The resource estimates were made from 3D block models created by utilizing commercial geological modelling and mine planning software. The block model cell size is 5 meters east by 5 meters north by 5 meters high. The mineral resources are reported within the constraining mineralized domain volumes that were created to control resource reporting and at a 3.0 grams per tonne (“g/t”) gold cut-off grade.
Parallel Deposit
The Mineral Resource estimate for the Parallel deposit used data from surface diamond drillholes. The resource estimates were made from 3D block models created by utilizing commercial geological modelling and mine planning software. The block model cell size is 5 meters east by 5 meters north by 5 meters high. The block model was not rotated. The mineral resources are reported within the constraining domain volumes that were created to control resource reporting and at a 3.0 g/t gold cut-off grade.
Ormaque Deposit
The Mineral Resource estimate for the Ormaque deposit used data from surface diamond drillholes. The resource estimates were made from 3D block models created by utilizing commercial geological modelling and mine planning software. The block model cell size is 5 meters east by 5 meters north by 5 meters high. The mineral resources are reported within the constraining volumes that were created to control resource reporting at a 3.5 g/t gold cut-off grade.
Mineral Reserve Estimate
The Mineral Reserve estimate is based on Measured and Indicated Mineral Resources for the Upper Triangle zones and Parallel deposit. Mineral Reserves are reported using a gold price of
Lamaque Project Mineral Reserves as of
Reserves | Proven | Probable | Total P&P | |||||||||
Zone | Tonnes | Grade | Ounces | Tonnes | Grade | Ounces | Tonnes | Grade | Ounces | % | ||
Upper Triangle zones | C1 | 40,867 | 4.96 | 6,516 | 120,884 | 6.38 | 24,810 | 161,751 | 6.02 | 31,326 | 2.9 | % |
C2 | 169,993 | 6.01 | 32,831 | 151,579 | 6.32 | 30,782 | 321,572 | 6.15 | 63,613 | 5.8 | % | |
C3 | 1,006 | 8.88 | 287 | 187,668 | 6.34 | 38,242 | 188,674 | 6.35 | 38,529 | 3.5 | % | |
C4 | 266,554 | 9.97 | 85,484 | 2,666,048 | 6.92 | 593,496 | 2,932,602 | 7.20 | 678,980 | 62.2 | % | |
C5 | 0 | 0.00 | 0 | 758,984 | 9.10 | 222,083 | 758,984 | 9.10 | 222,083 | 20.4 | % | |
Parallel | 0 | 0.00 | 0 | 269,005 | 6.08 | 52,588 | 269,005 | 6.08 | 52,588 | 4.8 | % | |
Surface Inventory | 23,227 | 5.60 | 4,182 | 0 | 0.00 | 0 | 23,227 | 5.60 | 4,182 | 0.4 | % | |
Total | 501,647 | 8.02 | 129,300 | 4,154,167 | 7.20 | 962,002 | 4,655,814 | 7.29 | 1,091,302 | 100 | % | |
Total recovered (96%) | 124,128 | 923,522 | 1,047,649 | |||||||||
*Note: Tonnes and grade are diluted and consider mining recovery. All splay veins are included in their related main zone. |
1See “Notes on Mineral Reserves” below.
Notes on Mineral Reserves
1. Long Term Metal Price Assumptions
- Gold price:
$1,300 /oz - Silver price:
$17.00 /oz - Copper price:
$2.75 /lb - Lead price:
$2,000 /t - Zinc price:
$2,300 /t
2. Cut-off Grades
Lamaque: 4.38 g/t Au
- Mineral Resources and Mineral Reserves are as of
September 30, 2021 , unless otherwise stated. The Mineral Resources and Mineral Reserves were classified using logic consistent with the CIM Definition Standards for Mineral Resources & Mineral Reserves (2014) incorporated, by reference, into National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101).- Mineral Reserves are included in the Mineral Resources.
The Mineral Resources and Mineral Reserves are disclosed on a total project basis.
Lamaque Project Cash Flows (Upper Triangle Reserve case)1, 2
Parameter | Year | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | Total | |||||||
Production Summary | |||||||||||||||
Total Tonnes Mined | kt | 744 | 812 | 862 | 869 | 831 | 326 | 4,445 | |||||||
Total Material Processed | kt | 762 | 812 | 862 | 869 | 831 | 326 | 4,462 | |||||||
|
g/t Au | 7.2 | 7.8 | 7.4 | 6.9 | 7.5 | 6.6 | 7.3 | |||||||
Mill Gold Recovery | % | 96.5 | % | 96.5 | % | 96.5 | % | 96.5 | % | 96.5 | % | 96.5 | % | 96.5 | % |
Gold Production | koz Au | 169.8 | 195.7 | 198.9 | 186.8 | 192.4 | 66.5 | 1,010.1 | |||||||
Revenue | |||||||||||||||
Gold Sales | $ M | 254.7 | 293.5 | 298.4 | 280.2 | 288.6 | 99.8 | 1,515.0 | |||||||
|
$ M | 1.5 | 1.8 | 1.8 | 1.7 | 1.7 | 0.6 | 9.1 | |||||||
Gross Metal Sales | $ M | 256.2 | 295.3 | 300.2 | 281.9 | 290.3 | 100.4 | 1,524.2 | |||||||
Transport & Refining Cost | $ M | 0.3 | 0.4 | 0.4 | 0.4 | 0.4 | 0.1 | 2.0 | |||||||
Royalty Payments | $ M | 2.6 | 2.9 | 3.0 | 2.8 | 2.9 | 1.0 | 15.2 | |||||||
Net Revenue | $ M | 253.3 | 291.9 | 296.8 | 278.7 | 287 | 99.2 | 1,507.0 | |||||||
Operating Expenditures | |||||||||||||||
Mining | $ M | 62.8 | 68.5 | 72.7 | 73.3 | 70.1 | 27.5 | 374.9 | |||||||
Processing | $ M | 17.1 | 18.2 | 18.8 | 19.0 | 18.6 | 7.3 | 99.0 | |||||||
General and Administration | $ M | 23.5 | 23.2 | 23.5 | 23.5 | 23.7 | 11.9 | 129.2 | |||||||
Operating Costs | $ M | 103.3 | 109.8 | 115.0 | 115.8 | 112.4 | 46.7 | 603.1 | |||||||
Earnings | |||||||||||||||
EBITDA | $ M | 150.0 | 182.1 | 181.8 | 162.9 | 174.6 | 52.5 | 903.9 | |||||||
Capital Expenditures | |||||||||||||||
Growth | $ M | 22.0 | 26.4 | 14.9 | 6.7 | 0.0 | 0.0 | 70.0 | |||||||
Sustaining | $ M | 56.5 | 58.1 | 44.6 | 24.6 | 35.5 | 0.0 | 219.3 | |||||||
Reclamation and Closure | $ M | 0.0 | 0.0 | 0.0 | 0.0 | 5.0 | 5.0 | 10.0 | |||||||
Salvage Value Credit | $ M | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | -3.0 | -3.0 | |||||||
Total Capital Costs | $ M | 78.4 | 84.5 | 59.5 | 31.3 | 40.5 | 2.0 | 296.2 | |||||||
|
$ M | 71.6 | 97.6 | 122.2 | 131.7 | 134.1 | 50.5 | 607.7 | |||||||
Cumulative |
$ M | 71.6 | 169.2 | 219.4 | 423.1 | 557.2 | 607.7 | 607.7 | |||||||
Taxes and Duties | |||||||||||||||
Income Tax | $ M | 0.0 | 0.0 | 0.0 | 1.9 | 8.1 | 2.8 | 12.8 | |||||||
Quebec Mining Duties | $ M | 10.4 | 15.6 | 17.0 | 15.5 | 18.4 | 0.5 | 77.5 | |||||||
Total Taxes and Duties | $ M | 10.4 | 15.6 | 17.0 | 17.4 | 26.5 | 3.3 | 90.3 | |||||||
After-Tax Cash Flow | |||||||||||||||
After-Tax Cash Flow | $ M | 61.1 | 82.0 | 105.2 | 114.3 | 107.6 | 47.1 | 517.3 | |||||||
Cumulative After-Tax Cash Flow | $ M | 61.1 | 143.1 | 248.3 | 362.6 | 470.2 | 517.3 | 517.3 |
1 Cash flows based on the Upper Triangle Reserves Case
2 These measures are non-IFRS measures. See the section ‘Non-IFRS Measures’ at the end of this press release and in Eldorado’s
Conference Call
A conference call to discuss the details of the Company’s Fourth Quarter and Year-End 2021 Results and the Lamaque Technical Study will be held by senior management on
Conference Call Details | Replay (available until |
|||||
Date: | +1 604 638 9010 | |||||
Time: | Toll Free: | 1 800 319 6413 | ||||
Dial in: | +1 604 638 5340 | Access code: | 8299 | |||
Toll free: | 1 800 319 4610 | |||||
About
Eldorado is a gold and base metals producer with mining, development and exploration operations in
Contacts
Investor Relations
604.757 2237 or 1.888.353.8166
[email protected]
Media
604.616 2296 or 1.888.363.8166
[email protected]
Qualified Persons
Except as otherwise noted, scientific and technical information contained in this press release was reviewed and approved by
The QPs and contributors responsible for preparing the Lamaque Technical Study are:
- Mr.
Jacques Simoneau , géo (OGQ No. 737), Exploration Manager Eastern Canada, Eldorado Gold - Mr. Peter Lind, Eng. (OIQ No. 133650),
P.Eng ., Director, Technical Studies,Eldorado Gold - Mr.
Ertan Uludag ,P.Geo ., Manager, Resource Geology,Eldorado Gold - Mr.
Jessy Thelland , géo (OGQ No. 758), Director, Technical Services Eldorado Gold Quebec - Mr.
Mickey Murphy ,P.Eng .,Stantec Consulting - Mr. Mehdi Bouanani, Eng. (OIQ No. 5000741), Director, Projects, Eldorado Gold Quebec
The relevant QPs have verified the data disclosed including sampling, analytical and test data underlying the information contained in this news release. This included an appropriate Quality Control sampling program of reference standards, blanks and duplicates to monitor the integrity of all assay results.
Notes on Lower Triangle Inferred and Ormaque Inferred PEAs
Readers should take care to differentiate these PEAs from the economic analysis for the Upper Triangle Reserves. The PEAs only demonstrate the potential viability of mineral resources and are not as comprehensive as the economic analysis for the Upper Triangle Reserves. The level of detail, precision and confidence in outcomes between the economic analysis for the Upper Triangle Reserves and the PEAs is significantly different.
The PEAs are preliminary in nature and are based on numerous assumptions and the incorporation of Inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves except as allowed for by National Instrument 43-101 in PEA studies. There is no guarantee that Inferred mineral resources can be converted to Indicated or Measured mineral resources and, as such, there is no guarantee that the economics described herein will be achieved. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Non-IFRS Measures
Certain non-IFRS ratios are included in this press release, including average realized gold price per ounce sold, cash operating costs per ounce sold, total cash costs per ounce sold, all-in sustaining costs ("AISC") per ounce sold and adjusted net earnings/(loss) per share. Certain non-IFRS financial measures are included in this presentation, or are used to derive the above-noted non-IFRS ratios, including cash operating costs (C1), total cash costs (C2), AISC, adjusted net earnings/(loss), cash flow from operations before changes in non-cash working capital, earnings before interest, taxes and depreciation and amortization ("EBITDA") and adjusted earnings before interest, taxes and depreciation and amortization ("Adjusted EBITDA"), free cash flow and sustaining capital.
The Company believes that these non-IFRS measures, in addition to conventional measures prepared in accordance with International Financial Reporting Standards (“IFRS”), provide investors an improved ability to evaluate the underlying performance of the Company. The non-IFRS measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers. Certain additional disclosures for these non-IFRS measures have been incorporated by reference and can be found in the section ‘Non-IFRS Measures’ in the
Non-IFRS Measure | Most Directly Comparable IFRS Measure | 2020 |
Cash operating costs (C1) | Production costs | |
Total cash costs (C2) | ||
AISC | ||
Average realized gold price per ounce sold | Revenue | |
EBITDA | Earnings before income tax | |
Adjusted EBITDA | ||
Adjusted net earnings/(loss) | Net earnings attributable to shareholders of the Company | |
Adjusted net earnings/(loss) per share | ||
Cash flow from operations before changes in non-cash working capital | Net cash generated from operating activities | |
Free cash flow | ||
Sustaining capital | Additions to property, plant and equipment |
Cautionary Note about Forward-looking Statements and Information
Certain of the statements made and information provided in this press release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as "plans", "expects", "is expected", "budget", “continue”, “projected”, "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.
Forward-looking statements or information contained in this release include, but are not limited to, statements or information with respect to: the Company's ability to successfully operate and advance the Lamaque project, including the growth of the Lower Triangle zones and Ormaque deposit, and achieve the results provided for in the Study; the results of the Study, including the mineral resource and reserves estimate, forecasts for the NPV5%, economics, life of mine, production, required capital, costs, and cash flow at the Lamaque project, including relating to the feasibility-level update at Upper Triangle zones and Parallel deposit, the PEA at the Lower Triangle zones and the PEA at the Ormaque deposit; expected production and operations, including grade; forecasted NPV, IRR, and EBITDA; expectations regarding operations advancement and development of the Lamaque project, including the ability to meet expectations and the timing thereof; expectations on mining operations, including mining methods and expected mining and production, including volume, grade and costs; expectations on adequacy of surface infrastructure at the Lamaque project, including addition infrastructure needs based on further development at the Lamaque project; requirements for permitting and compliance therewith, including receipt of future required permits or amendments thereto, including at the Lamaque project; future collaboration with and support from relevant Val-d’Or communities; expected future exploration and development opportunities in the Abitibi area; expectations on use of new technologies and evaluations of such studies, including benefits therefrom; expectations on emissions; the social impact and benefits of the Lamaque project, including in the local communities; estimates of Mineral Resources and Reserves, including all underlying deposit assumptions, and the conversion of Mineral Resources to Mineral Reserves; the filing of a technical report reflecting the results of the Study; our expectation as to our future financial and operating performance, including future cash flow, estimated cash costs, expected metallurgical recoveries, gold price outlook; and our strategy, plans and goals, including our proposed exploration, development, construction, permitting and operating plans and priorities, related timelines and schedules.
Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.
We have made certain assumptions about the forward-looking statements and information, including assumptions about our ability to execute our plans relating to the Lamaque project as set out in the Study, including the timing thereof; ability to obtain all required approvals and permits or amendments thereto; the assumptions provided for in the Study will be accurate, including gold price, exchange rates, cost estimates; assumptions regarding infrastructure requirements in the future at the Lamaque project; assumptions regarding support of relevant local communities; no changes in input costs, exchange rates, development and gold; the geopolitical, economic, permitting and legal climate that we operate in, including at the Lamaque project; the future price of gold and other commodities; exchange rates; anticipated costs and expenses; production, mineral reserves and resources and metallurgical recoveries, the impact of acquisitions, dispositions, suspensions or delays on our business and the ability to achieve our goals.
Even though our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statement or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others, the following: any changes to the final Study ability to execute on plans relating to the Lamaque project, including the timing thereof, ability to achieve the benefits contemplated; risk relating to permitting and obtaining the required approvals, changes in exchange rates, input costs, development costs and gold prices; geopolitical and economic climate (global and local), risks related to mineral tenure and permits; gold and other commodity price volatility; recoveries of gold and other metals; results of test work; risks regarding potential and pending litigation and arbitration proceedings relating to the Company’s business, properties and operations; expected impact on reserves and the carrying value; the updating of the reserve and resource models and life of mine plans; mining operational and development risk; foreign country operational risks; risks of sovereign investment; regulatory risks and liabilities including, regulatory environment and restrictions, and environmental regulatory restrictions and liability; discrepancies between actual and estimated production, mineral reserves and resources and metallurgical testing and recoveries; additional funding requirements; currency fluctuations; community and non-governmental organization actions; speculative nature of gold exploration; dilution; share price volatility; competition; loss of key employees; and defective title to mineral claims or properties, as well as those risk factors discussed in the sections titled “Forward-Looking Statements” and "Risk factors in our business" in the Company's most recent Annual Information Form and Annual Report on Form 40-F. The reader is directed to carefully review the detailed risk discussion in our most recent Annual Information Form filed on SEDAR and EDGAR under our Company name, which discussion is incorporated by reference in this release, for a fuller understanding of the risks and uncertainties that affect the Company’s business and operations.
Forward-looking statements and information is designed to help you understand management’s current views of our near and longer term prospects, and it may not be appropriate for other purposes.
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in
Financial Information and condensed statements contained herein or attached hereto may not be suitable for readers that are unfamiliar with the Company and is not a substitute for reading the Company’s financial statements and related MD&A available on our website and on SEDAR under our Company name. The reader is directed to carefully review such document for a full understanding of the financial information summarized herein.
Mineral resources which are not mineral reserves do not have demonstrated economic viability. With respect to “indicated mineral resource” and “inferred mineral resource”, there is a great amount of uncertainty as to their existence and a great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of a “measured mineral resource”, “indicated mineral resource” or “inferred mineral resource” will ever be upgraded to a higher category.
Cautionary Note to US Investors Concerning Estimates of Measured, Indicated and Inferred Resources
Technical disclosure regarding the Company’s properties included herein (the “Technical Disclosure”) has been prepared in accordance with the requirements of the securities laws in effect in
Source: