LOCATION Chalkidiki Peninsula, Northern Greece
DEPOSIT Gold-silver-lead-zinc
RESERVES (100%; at December 31, 2011)
Proven + Probable 4.1 Moz @ 7.9 g/t Au, 58.8 Moz @ 114 g/t Ag, 599 Kt Pb, 796 Kt Zn
RESOURCES (100%; at December 31, 2011)
Measured + Indicated 4.3 Moz @ 8.9 g/t Au, 61.9 Moz @ 130 g/t Ag, 630 Kt Pb, 839 Kt Zn
OWNERSHIP 95% (through Hellas Gold)
PROJECT STATUS AND HISTORY
  • Fully permitted
  • Phased development plan with US$207 million estimated development capital
    • Mill refurbishment complete
    • Rehabilitation of the underground mine continues
    • Portal development for the ~8km tunnel linking Stratoni and Olympias completed in Q2 2012
    • Commissioning of processing plant started late Q2 2012
    • Concentrate production from tailings commenced in Q3 2012
  • Orebody open at depth and potential to add significant resources and reserves

Description


The Olympias property is located in the Chalkidiki peninsula, Northern Greece. The project is within a group of granted mining and exploration concessions covering 317 km2, approximately 100 km east of Thessaloniki. The area is located at approximately Latitude 40° 36' and Longitude 23° 50'.

Files


Technical Report on the Olympias Project; July 14, 2011 (3.4 MB)